Louis D. Chirillo

Skip to content
  • Home
  • About
  • My Books
    • I knew a lad
    • Navy Afloat
    • Navy Ashore
    • Post Navy
  • Shipbuilding Res.
    • Outfit Planning – December 1979
    • Process Analysis Via Accuracy Control…………… February 1982
    • Pipe Piece Family Manufacturing – March 1982
    • Line Heating – November 1982
    • Product Work Breakdown Structure……………… Revised December 1982
    • Integrated Hall Construction, Outfitting and Painting – May 1983
    • Design for Zone Outfitting – September 1983
  • Afterguard
  • Shipbuilding DB
  • Photos
  • Ref.
  • Memorial
Louis D. Chirillo

Shipbuilding Research

National Shipbuilding Research Program Panel SP-2 Publications

  1. Outfit Planning – December 1979
  2. Process Analysis via Accuracy Control – February 1982
  3. Pipe Piece Family Manufacturing – March 1982
  4. Line Heating – November 1982
  5. Product Work Breakdown Structure – Revised December 1982
  6. Integrated Hull Construction, Outfitting and Painting – May 1983
  7. Design for Zone Outfitting – September 1983

Database Categories

Pictures of Applications:
  • Avondale Applications of a PWBS
    (45 photos)
  • Appledore Shipbuilders Application of a PWBS (16 photos)
  • D.W. Challinor's Application of a PWBS in Versatile Pacific and MIL Davie (45 photos)
  • Naval Shipyard Applications of a PWBS (42 photos)
  • U.S. Shipyard Applications of a PWBS (44 photos)
  • Frigates (Destroyer Escorts) and Destroyers (21 photos)

Pictures of Processes:
  • Parts Fabrication (48 photos)
  • Sub-Block Assembly (29 photos)
  • Block Assembly (74 photos)
  • Hull Erection (45 photos)
  • Outfit Components (25 photos)
  • On-Unit Outfitting (30 photos)
  • On-Block Outfitting (32 photos)
  • On-Board Outfitting (23 photos)

Pictures from NSRP Publications:
  • Product Work Breakdown Structure (PWBS) (NSRP 0164) (52 photos)
  • Process Analysis via Accuracy Control (NSRP 0214) (38 photos)
  • Line Heating (NSRP 0163) (48 photos)
  • Pipe-Piece Family Manufacturing (NSRP 0147) (24 photos)
  • Outfit Planning (NSRP 0096) (62 photos)
  • Integrated Hull Construction, Outfitting, and Painting (NSRP 0169) (10 photos)
Proudly powered by WordPress