Louis D. Chirillo

Skip to content
  • Home
  • About
  • My Books
    • I knew a lad
    • Navy Afloat
    • Navy Ashore
    • Post Navy
  • Shipbuilding Res.
    • Outfit Planning – December 1979
    • Process Analysis Via Accuracy Control…………… February 1982
    • Pipe Piece Family Manufacturing – March 1982
    • Line Heating – November 1982
    • Product Work Breakdown Structure……………… Revised December 1982
    • Integrated Hall Construction, Outfitting and Painting – May 1983
    • Design for Zone Outfitting – September 1983
  • Afterguard
  • Shipbuilding DB
  • Photos
  • Ref.
  • Memorial
Louis D. Chirillo

Post Navy

Post Navy encounters – a memoir

  • Acknowledgements
  1. Chairman Lou, Chairman Les & Chairman Mao
  2. Nakagawa & O.B.
  3. Therapy
  4. Scandanavia
  5. Mr. Zhang
  6. On Shanghai’s Bund in ’81
  7. W. Edwards Deming
  8. Emotion On the Clyde
  9. Belfast
  10. Linden Hall
  11. Gleddoch House
  12. Return to Kure
  13. Tidbinbilla
  14. The Bus Driver’s Jackaroos
  15. Vancouver, British Columbia
  16. The Man of Peace
  17. The Basques
  18. Madre
  19. The Extraordinary Miss
  20. Galicia
  21. The Dock Master
  22. The Queue

Copyright (text only) © 2006 by Louis D. Chirillo

Database Categories

Pictures of Applications:
  • Avondale Applications of a PWBS
    (45 photos)
  • Appledore Shipbuilders Application of a PWBS (16 photos)
  • D.W. Challinor's Application of a PWBS in Versatile Pacific and MIL Davie (45 photos)
  • Naval Shipyard Applications of a PWBS (42 photos)
  • U.S. Shipyard Applications of a PWBS (44 photos)
  • Frigates (Destroyer Escorts) and Destroyers (21 photos)

Pictures of Processes:
  • Parts Fabrication (48 photos)
  • Sub-Block Assembly (29 photos)
  • Block Assembly (74 photos)
  • Hull Erection (45 photos)
  • Outfit Components (25 photos)
  • On-Unit Outfitting (30 photos)
  • On-Block Outfitting (32 photos)
  • On-Board Outfitting (23 photos)

Pictures from NSRP Publications:
  • Product Work Breakdown Structure (PWBS) (NSRP 0164) (52 photos)
  • Process Analysis via Accuracy Control (NSRP 0214) (38 photos)
  • Line Heating (NSRP 0163) (48 photos)
  • Pipe-Piece Family Manufacturing (NSRP 0147) (24 photos)
  • Outfit Planning (NSRP 0096) (62 photos)
  • Integrated Hull Construction, Outfitting, and Painting (NSRP 0169) (10 photos)
Proudly powered by WordPress